产品搜索
  • 产品搜索
  • 资料搜索
文章正文

FZF-6型水泥组分仪英文说明书

所属目录:说明书库浏览次数:237发布日期:2018-11-15作者:PLB-writer


The manual of the FZF-6 instrument
measuring the cement component

● Outline
The FZF-6 instrument measuring the cement component is rests on GB/T12960-1996"Cement Component Quantitative determination" the standard and its themethod, diligently attacks after the Beijing FuRuiChen electron machinery limited company famous engineers and techniciansafter experiments, the debugging, the revision many times developssuccessfully with the GB/T12960-1996 necessary special-purposeinstrument, is determines the cement component the idealinstrumentation equipment
.
GB/T12960-1996 "Cement Component Quantitative determination" thestandard may in the quantitative determination cement the volcano graymatter mix material, the pulverized coal ash and the gangue componentcontent. Is suitable to the Portland cement, the Portlandblast-furnace cement, the ordinary Portland cement and so on.
The determination volcano gray matter mix material and the pulverizedcoal ash component content, the identical laboratory allowance erroris 0.8%, the different laboratory allowance error is 1.0%, thedetermination gangue component content, the identical laboratoryallowance error is 1.0%, the different laboratory allowance error is1.2%.

The FZF-6 cement component cryoscope uses the advanced semiconductorrefrigeration technology, the high quality digital temperature sensor,using the monolithic integrated circuit took the central controlsystem, may wilfully establish the constant temperature temperature in0 ℃ ~60 ℃scope, and the automatic selection refrigeration orheats up, the control precision is smaller than ±1 ℃Startingconstant temperature condition at the same time, the system stirs theautoloading, this instrument has primary reaches when constanttemperature reports to the police the function, the reminder operatorsystem had achieved the constant temperature spot, was allowed tocarry on the next step of experiment.
● main technical parameter
1. Power source : AC 220V/50Hz
2. Fixed time range: 0 to 99m59S
3. controlled the temp range: 0 to 59.9℃ 

 

4. Control led precision : < 1℃
5. Cool/heat: In 30 m reaches any constant temperature spot.
6. primary arrives the constant temperature spot, fixed timefinished has reports to the police the prompt.
● operating instructions
1. The instrument control panel introduced that, (Sees chart one)


                           chart one
1. temperatures values display monitor 2. Time value display monitor
3. Operates the key: [ ] The parameter supposes the localizationchoice key   [ ] the parameter hypothesis to add as soon as operates thekey   [ ] The parameter hypothesis reduces as soon as operates thekey  [ constTemp] the constant temperature to start/theclose button  [ Stir ] stirs the start/close button  [ time/stop ] fixed time or stop work
 instrument side kneading board introduction (chart two)
 
                      chart two
1. Cooling fan 2. Cooling water pump power source plug 3. Instrument power source plug

 instrument assembly
first, please open the instrument packing, two silica gels tube Connects to on the instrument back underneath two metals tap, takes out thecooling water pump, silica gel tube connects to the water pump wateroutlet, another puts in cools in the water trough (to cool watertrough to be possible to use plastic constant temperature water troughsubstitution, joins cooling water must surpass cooling water pump).Inserts the water pump power source plug to the cooling water pumppower source place in then.

Second,takes out the instrument power line (three cores computersspecial-purpose power line) to connect on the instrument power sourceplug, puts through the instrument power source, and turns in the boardthe power switch. This time, on the board the digital tube is bright,and started to examine in the water trough the temperature.
 instrument use
Connects in parallel fashion in the instrument after the aboveassembly conclusion passes the power source, this machine namelyenters to the readiness for action, under the readiness for action,the operator may establish the constant temperature temperature, fixedtime experiment and so on time uses the parameter, the parameterhypothesis to finish then carries on the experimental operation.
 parameter hypothesis:
 First according to [ ] enters the hypothesis operation contactsurface, correspondingly the dirty bit which chooses is glittered,this time according to [ ] either [  ] may carry on to thecorresponding position adds one or reduces an operation, after thehypothesis completes presses [ ] the key then to press smooth choiceall positions and to carry on the revision again, after the revisionfinished presses [  ] key again, the system automatically completes thenew hypothesis parameter the memory. Does not have any key accordingto [  ] the key 3 seconds in to press down, system self-recovery forreadiness for action.
 experiment operation
After revises the complete system parameter, the system returnsthe readiness for action, this time joins 600 ~ 800ml water to Constant temperature water trough center, in the readiness for action according to [ constTemp ] the key, then the adjustment stirs 1 knob,

 

 


theobservation constant temperature water trough take causes in theconstant temperature water trough the water to flow as is suitable.The system will defer to the hypothesis the temperature valueautomatic selection to heat up or the refrigeration, enable Constant temperature water trough in temperature to tend to supposes the definite value, and in firsttime achieved when constant temperature temperature will report to thepolice, reminds the operator to be possible to carry on the next stepof operation.
 
After arrives constant temperature, the operator may be loaded withthe test specimen in the beaker to put in a grain to stir the child,and puts in the beaker Constant temperature water trough in the support, and is fixed with the knob, then presses down [ stir ] the key, the adjustmentstirs 2, stirs 3 knobs. Causes to stir child's to meet therequirements in beaker velocity of whirl. This time then presses [ time /stop] the key, the system enters the fixed time experimentalstage, after arrives fixed time the time, the instrument automaticallystops the constant temperature operating and stirring. To this, thisdetermination ended, might take out the experiment to carry on thefollowing testing.
 Experiment
In carries on the cement component before the determination,please careful reading stochastically attaches national standardGB/T12960-1996 which presents as a gift "Cement Component Quantitativedetermination". And prepares each kind of reagent and the equipmentwhich needs.
 
Puts steadily on the instrument, the smooth work table, connects onthe instrument rear panel the cooling water system, and silica gel tube connect s to the cooling water pump on, takes a commonly used plasticto maintain the water trough, and in the among flood water, thecooling water pump and the cooling water another silicon rubber tubewill put in the water trough (to pay attention to return pipe to befixed well). Inserts the water pump power source to the instrumentright flank on the plug, inserts the instrument power line connects inparallel fashion passes the power source. This time turns in the boardthe power switch, on the kneading board digital tube is bright, and indemonstration constant temperature experiment water troughtemperature.

600 ~ 800ml water influx stainless steel constant temperature watertrough in, according to experiments the request to adjust the goodinstrument the constant temperature temperature and fixed time thetime. 50ml in the water influx 150ml beaker, sets at the beaker in thecement component recognizer, and [ stir ] the key according to [constTemp], the adjustment stirs 1, stirs 2,

 

 


stirs 3 toadjust Niu, adjusts 3 to stir the electrical machinery rotationalspeed to gather on just at the time

Primarily waits the instrument after to achieve the constanttemperature spot reports to the police, then carried on experimented,according to experimented the request, might according to [ time/stop] the key, this time the instrument enter the fixed time operatingstatus, the time which on the instrument demonstrated for the worktime, after arrived the hypothesis the time the instrument to reportto the police, this operation conclusion
.
 When closes the instrument, please finally closes the power switch,and tears off the power source plug.
pulls out filters the installation diagram, sees attempts.

 


1 - 2xz-0.25 turns on lathe the piece vacuum pump
2 - cushions bottles: Gets up the cushioning effect, inprevented the filtrate enters pumps, 1000mL 3 - pulls out the filtering flask: 1000ML 4 - acidproof glass funnels (glass funnel): Phi 40 orPhi 60, G4
 turns on lathe the piece vacuum pump the use
1. pumps should place dryly is ventilating with the cleanplace.
2. examinations oil levels: Take stops pumps when Pours into the oil to the oilgauge center as is suitable. Oil level Gao Huoguo low has interfered with the normal work which pumps.

When revolution the oil level haselevates, is the normal phenomenon
3.oil useds choices: Best uses high speed vacuum pump oil or the 3#proliferation oil.
4.guarantees pumps clean, in prevented the sundry goods enter pump.
5. trades the oil method: In because the sundry goods enter pumpaffect pump pull out the strength, time the necessity replaces oil.When trades the oil, first Turns on the air pump and revolves 20 - 30 minutes, causes the oil to change thinly, stops pumps, puts the oil from the oil drainhole, after puts the oil from the mouth of the air feeder slowly to join few clean oil, to clean the pump oil, finally again pours into the oil to oil gaugecenter.
6. cannot mix in the diesel oil, the gasoline and so on the mixed oil.
7. if because pumps needs to disassemble the clean or the overhaul,must pay attention to in the instruction booklet to disassemble andassemble the step.
8. pulls out the phenomenon which the strength is insufficient andremoves:
(1) the oil level is insufficient, refuels to the oil level.
(2) the oil is polluted, trades the fresh oil.
(3) pumps outside the mouth to take over control, the vessel, to meetprime leaks air, promptly takes the measure.
(4) the air feeder or was mad the town valve rubber assembles isimproper, the damage or the aging, should adjust or the replacement.
(5)  turns on lathe the leaf spring to break off, should with exchange.
(6)  pumps with the support connection screw has not fronted well, hasnot screwed tight, prompt reinforcement.
 

 

 

 

Packing list


Name                       Quantity
Power line 1
Fuse  2
Water trough cover                1
Beaker locator                1
Granulated substance core funnel               10
pulls out filtering flask 2
silicon rubber tubes               2 meters
instruction booklets               1
standards               1
stirs child               4
vacuum pumps 1 set
cooling water pumps (dive water pump) 1 set
silicon rubber tubes (vacuum pump uses) 2
rubber fill 2
beakers 2

 

 

分类标签:水泥组分仪